Project Manager/Engineer for a design-build project for a hydrant fuel system around a new 12 gate north pier connected to the main terminal. The project consisted of a single 12-inch fuel main originating at an existing valve pit at the Main Terminal and running along a connector bridge to a valve pit at the beginning of the North Pier building. The single main connected to a 12-inch pipe loop around the North Pier. A surge suppressor pit was included in the design at the north end of the North Pier. An EFSO System was designed to connect EFSO activation stations at each gate to the existing pump station in the tank farm’s pump control system.